41.JPG
East wall after the final coat was applied.
|
42.JPG
The inside after the colored concrete has been sprayed in.
|
43.JPG
Another view of the inside after the final coat
|
44.JPG
The inside back wall. The 3" pipe is for the exhaust/air intake for the Toyostove that will heat the garage; the smaller pipe is for the fuel line. The other spots are bolts sticking out of wall, some with plastic wrap hanging down.
|
45.JPG
Closeup showing the final texture.
|
46.JPG
To get some perspective on the size of the shotcrete equipment, here the guys are hooking the trailer to their pickup.
|